Moorhead High School Remodel and Addition

Moorhead, MN

Part of the $110 million bond referendum passed in 2019 includes the remodel and addition of Moorhead High School. The design has 400,000 square feet of new construction, which includes a larger academic space, gymnasium and fine arts area. The new layout will allow for more parking spaces and a more convenient door for students to enter.

Martin Mechanical Design collaborated on this project since the early stages and will continue to assist during construction in 2021.

Cullen Hockey Center

Martin Mechanical is excited to be a part of this project, which will be completed with Icon Architectural Group in 2019. The mechanical design uses high efficiency heating and cooling equipment designed to react to the ever-changing conditions in a hockey arena.

Moorhead, Minnesota

Brown Hall – Concordia College

Originally built in 1947, Brown Hall is an iconic, historic space on Concordia’s Campus. The four-story structure houses around 260 men and women. We were asked to create a new mechanical system to improve ventilation and indoor air quality.

The previous system had air conditioning in the public spaces, with little natural air flow. We updated the building to get fresh air and be up to date with current ventilation codes. The building’s humidity was not controlled, with moisture causing problems and discomfort to the residents. With our new systems, the building was able to heat and cool effectively, while keeping moisture at a minimum.

Moorhead, Minnesota